CASE STUDY

New House Park, St Albans

New House Park, St Albans

This project started as a mixture of a fairly modest extension, remedial works and some reconfiguration.

What transpired was that the clients really wanted to rethink the way their family home worked for them now, and for the future.

The result was that almost every space was moved or changed on the ground floor, and the first floor was heavily renovated as well.

External modernisation such as a new roof, replacement glazing and a massively improved main reception space with a beautiful bespoke American oak staircase were integrated.

To round this project off, a spacious rear terrace and entertaining area with timber pergola were added.

Much of this was executed during the pandemic, and is a testament to excellent communication, careful planning and great teamwork.

New House Park - Extension & Renovation in St Albans
New House Park - Extension & Renovation in St Albans

Works carried out

Project Type: Architectural and interior design input.
Timescale: 37 Weeks.

Key Features include:

  • New roof.
  • Rear patio/garden works.
  • Additional ensuite bathrooms.
  • Two-storey front extension.
  • Front Driveway.
  • Remainder of house significantly reconfigured, renovated, and redecorated.
  • Garden room with pergola and entertaining space.
  • Utility Room designed, supplied, installed and commissioned.
  • Kitchen commissioned.
  • Complete electrical and plumbing works.
Quotes

What our clients say

Ready to make your dream home a reality?

Scroll to Top